Skip to content
Quote

Attic under renovation, 45 m².

Attic under renovation, Lublin: photo 1 of 3
3 photos from the site
Area45 m²
Time1 day
ScreedCement
PropertyAttic

An attic under renovation with plasterboard walls. Underfloor heating went in before it was time for the floors.

How the job went

  1. 01 Starting point

    The attic renovation was under way and the wall boards were already up. A new screed would have meant moisture and waiting.

  2. 02 What we did

    We milled channels into the existing floor, laid the pipes and filled them in without touching the fresh walls.

  3. 03 Result

    One day, and the renovation could carry on. The attic is heated from the floor.

Have a similar attic?

Quote

How much will it cost you?

Give us the floor area and your phone number. We'll call back with a price, with no obligation.

What happens next

  1. We call you back and ask about your screed.
  2. We give you a price. For an unusual floor, we take a look first.
  3. We agree on a date and arrive with all the equipment.
m²

We'll only use your number to contact you about the quote. Privacy policy.

Call