Area70 m²
Time2 days
ScreedCement
PropertyAttic
A finished attic with a manifold for eight loops. Every room got its own circuit, so it can be heated separately.
How the job went
01 Starting point
The attic was already insulated and plastered. Breaking up the floor would have ruined the freshly finished walls.
02 What we did
We planned eight loops from one manifold, milled the channels and laid the pipes with no joints under the floor.
03 Result
Every room has its own circuit and its own temperature, and the walls were left untouched.